Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. mOuNTING

INSTALLATION OF THE WHEEL LIFT (optional)
- Fix the wheel lift platform on the rod using the pin and the seeger.
- Fix the stabilization rod with the screw and the relative nut and washer (Fig.5a).
- Assemble the grease-holder carter using the on-purpose screws.
5. LIFTING/HaNDLING
In order to remove the machine from the pallet, hook it as shown in fi gure 7.
This lifting point must be used whenever you need to change the position of the machine.
Do not attempt to move the machine until it has been disconnected from the power and
pneumatic supply networks.
Before proceeding with the electrical and pneumatic connection, remove the
hoisting bracket, unscrewing the screws and washers (Fig.7)
24
5a
WARNING
7
User's manual

Publicité

Table des Matières
loading

Produits Connexes pour CEMB SM1100

Table des Matières