End Of The Work - Hillyard Trident WD21V Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

At the end of the work, and before carrying out any type of maintenance, perform the following opera-
tions:
1.Make sure the machine is in a safe condition (read "MACHINE SAFETY").
2.Take the machine to the designated collection tank emptying place.
3.Empty the collection tank (read "EMPTYING THE COLLECTION TANK").
4.Remove the accessory from the extension. Clean it under running water and place it in the
object-holder pocket.
5.Remove the female part of the extension from the male part. Clean it under running water and pla-
ce it in the object-holder pocket.
6.Remove the extension from the nozzle in the vacuum hose. Clean it under running water and place
it in the object-holder pocket.
7.Press the button (5) on the vacuum nozzle.
8.Remove the vacuum hose from the hole (6) on the vacuum nozzle. Clean it under running water
and wind it around the handlebar.
9.Remove the front squeegee (if fitted) and clean off any impurities (read "CLEANING THE FRONT
SQUEEGEE (OPTIONAL)").
10.Take the machine to its designated storage place.
AT THE END OF THE WORK
ATTENTION: the place designated for this
purpose must comply with the current envi-
ronmental protection regulations.
ATTENTION: park the machine in an enclo-
sed place, on a flat surface. There must be no
objects nearby that could either damage it, or
be damaged through contact with it.
23

Publicité

Table des Matières
loading

Table des Matières