• Guiding the trowel on the slab is very simple. Get into the operator's position behind the center of
handle, attain a good footing and apply the throttle slowly until desired speed is obtained. (A)
• Push handle down and machine will move to the right (B), lift handle up and machine will move to the
left. (C)
• Slightly twist to the left and the machine will move to the left. The machine will remain stationary, it you
do not apply any force up and /or down.
Stopping the engine
• Never use the choke to stop the engine. Leave the machine run at an idle speed for 2-3 minutes to cool
down
• Move the Gas lever to minimum throttle.
• Turn the button, which is on the gasoline engine, to the OFF position to stop the machine lastly.
The blade pitch control knob is at easy reach of the operator. The pitch adjustment has an unlimited pitch
variation and this can be undertaken whenever necessary. During finishing setting up/hardening may vary
from area to area across the floor, so the pitch adjustment can be changed to suit accordingly while the
machine is in operation. When transporting the trowel on a truck, always keep blades fully horizontal flat
on the floating disc.
For transportation of the machine use lifting eye. Alternatively to lift the machine, use an aid equipment
through the stationary ring, which can carry the weight of the machine, with a carrying pipe on the back
past of the handle.
Engine
Engine type
HONDA
Technical spécifications
Horsep Ower
(HP)
GX200
6,5
Opération
Blade adjustment
Transportation
Weight
(Kg)
(L x Larg x H - mm)
80
15
Dimensions
2100 x 950 x 1040
Max torque (rpm)
115