7.2.
Installation of Type 6013
Any installation position.
Preferably with magnet system face up.
1.
Clean pipelines.
2.
Any installation position
→
Preferential direction with actuator face up.
3.
Connect dirt trap upstream
→
Observe direction of flow!
4.
Seal
→
PTFE.
5.
Screw in pipelines
→
Observe direction of flow!
6.
Install / remove.
NOTE!
Information for devices with connecting cable:
Connecting cable and coil are encapsulated. They must not be
removed!
Always connect protective conductor!
7.
Connect to power supply.
14
english
PTB 00 ATEX 2129 X
Start-up
8.
START-UP
8.1.
Safety instructions
WARNING!
Risk of injury from improper operation!
Improper operation may result in injuries as well as damage to the
device and the area around it.
• Before start-up, ensure that the operating personnel are familiar
with and completely understand the contents of the operating
instructions.
• Observe the safety instructions and intended use.
• Only adequately trained personnel may start up the equipment/
the device.
8.2.
Start-up
Before starting up the device, ensure that:
• the device has been installed correctly,
• the connection has been made properly,
• the device is not damaged,
• all screws have been tightened.