INSTALLATION
Figure 4 — A Typical Installation Diagram for Transfer Switch
Utility
Connection
Generator
Connection
Ground
Terminal
CT 2
CT 1
To Generator
System Setup
You must perform the following before operating the
system:
• Place the 2 position sliding switch on the control module
in the NG or LP position (Figure 7), whichever is
appropriate for your system.
• Place the 3 position sliding switch on the control module
to match the KW rating of the Home Standby Generator
set (Figure 7).
To Utility Power
NOTE: Models 071010 and 071011 have a utility disconnect
circuit breaker built into the transfer switch enclosure.
Supervisory
Contacts
Load
Connection
Wireways
Neutral
Terminal
Main Distribution Panel
Main
Neutral
Bus
Ground Bus
Figure 7 — Control Module
2 Position
Switch
3 Position
Switch
9