ABB APC Instructions D'installation, D'utilisation Et D'entretien page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Figure 3.4. Power cables connection to the incoming power terminals for boxes
3.4.3.2.
APCM1, APCM2 and APCR cubicles
The APCM and APCR cubicles are available in bottom or top cable entry. By default, the bottom cable entry
is applied.
The plate at the bottom left of the cubicle is provided to allow cable entry (see Figure 3.1.) In case of top
cable entry, use the two other plates at the top of the cubicle.
Run the power cable through a gland of a suitable diameter in order to keep the protection level of the
cubicle.
APCM1
(bottom cable entry on the picture)
Figure 3.5. Power cables connection to the incoming power terminals for cubicles
3.4.4.
Current transformer connection
Current transformers of Class 1 accuracy and appropriate burden with secondary current 5A will normally be
used. In case CT and the automatic capacitors are close to each other a 5VA burden is sufficient if no other
loads are connected to the CT.
The current transformer must be sited in a position to monitor the total load (i.e. inductive load and
capacitive load). This will normally be close to the incoming supply metering position. A range of ring and
split core CTs exists on the market to ease installation.
Current transformers are normally marked P1/P2 and S1/S2 and should be positioned so that P1 faces
the incoming supply while P2 faces the load side.
Control wires from S1 terminal go to terminal marked
l
terminal marked
on the diagram.
Note: A gray jumper is provided with the bank in a small plastic bag. Use this gray jumper in case
shorting of the CT secondary winding is required (e.g. PF controller removal). As long as the PF
controller remains wired to the bank, the gray jumper must be removed for proper operation of the
bank.
To easy guide control wires, a cable profile is fixed in each box.
APC - Chapter 3. Installation
APCL2
APCM2
(bottom cable entry on the picture)
k
APCR
(top or bottom cable entry)
on the circuit diagram and from S2 to
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

ApcrApcm2Apcm1Apcl2

Table des Matières