3
Electrical installation
Mains connection 230 V/240 V
Fuses and cable cross−sections (operation with rated power)
8200 vector
Type
[kW]
E82EV251K2C
0.25
E82EV371K2C
0.37
E82EV551K2C
0.55
E82EV751K2C
0.75
E82EV152K2C
1.5
E82EV222K2C
2.2
E82EV551K2C
0.55
E82EV751K2C
0.75
E82EV152K2C
1.5
E82EV222K2C
2.2
8200 vector
Type
[kW]
E82EV251K2C
0.25
E82EV371K2C
0.37
E82EV551K2C
0.55
E82EV751K2C
0.75
E82EV152K2C
1.5
E82EV222K2C
2.2
E82EV551K2C
0.55
E82EV751K2C
0.75
E82EV152K2C
1.5
E82EV222K2C
2.2
Fuse
E.l.c.b.
1)
Use UL−approved cables, fuses and fuse holders only.
UL fuse: 240 V voltage, tripping characteristic "H", "K5" or "CC"
2)
Pulse−current or universal−current sensitive earth leakage circuit breaker
3)
All−current sensitive e.l.c.b.
Observe national and regional regulations (e. g. VDE 0113, EN 60204)
98
Installation to EN 60204−1
mains
M10 A
M10 A
1/N/PE AC
M10 A
2/PE AC
180 ... 264 V;
M16 A
45 ... 65 Hz
M20 A
M6 A
3/PE AC
M10 A
100 ... 264 V;
M16 A
45 ... 65 Hz
M16 A
Installation to EN 60204−1
mains
M10 A
M10 A
1/N/PE AC
M10 A
2/PE AC
180 ... 264 V;
M10 A
45 ... 65 Hz
M16 A
M20 A
M6 A
3/PE AC
M6 A
100 ... 264 V;
M10 A
45 ... 65 Hz
M10 A
EDK82EV222 DE/EN/FR 10.1
Operation without mains choke
Installation to UL
L1, L2, L3,
PE
2
[mm
]
C10 A
1.5
10 A
C10 A
1.5
10 A
B10 A
1.5
10 A
B16 A
2.5
15 A
B20 A
2 x 1.5
20 A
Operation only with mains choke
B6 A
1
5 A
B10 A
1.5
10 A
B16 A
2.5
15 A
B16 A
2.5
15 A
Operating with mains choke
Installation to UL
L1, L2, L3,
PE
2
[mm
]
C10 A
1.5
10 A
C10 A
1.5
10 A
B10 A
1.5
10 A
B10 A
1.5
10 A
B16 A
2 x 1.5
15 A
B20 A
2 x 1.5
20 A
B6 A
1
5 A
B6 A
1
5 A
B10 A
1.5
10 A
B10 A
1.5
10 A
1)
L1, L2, L3,
FI
PE
[AWG]
16
16
16
³ 30 mA
2)
14
2 x 16
18
16
³ 30 mA
3)
14
14
1)
L1, L2, L3,
FI
PE
[AWG]
16
16
16
³ 30 mA
2)
16
2 x 16
2 x 16
18
18
³ 30 mA
3)
16
16
L