Pfaff ALPHA Mode D'emploi page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wall mounted winch >ALPHA<
English
Mounting Instructions
Mounting:
ATTENTION:
The mounting structure must be designed to sustain the max. forces imposed by
the winch
Pay careful attention that the mounting surface is flat and true,
Only fix the winch by means of good quality screws
Tighten the screws evenly
Secure the screws
After tightening the set-screws, close the fixing holes with protection caps.
Ensure that the crank is free running (crank clearance)
Mechanical Fixing:
Type
Screws
Material grade
Number of screws
Tightening torque
Rope coiling
ATTENTION: With wrong rope coiling the brake is not effective.
Rope
direction
Wire rope fixing
Operating Instructions
Safety Instruction: The winches are only suited for manual operation.
lifting
technische Änderungen vorbehalten
Rope coiling has to be effected acc. to the drawing (direction by choice).
For rope selection pay attention to the technical data for the rope (see page 9)
Calculate the rope length in such a way that at least 3 full turns of rope remain
on the drum in lowest load position.
Insert the rope in consideration of rope winding direction.
Tighten clamping screw
Tightening torque for clamping screws
Type
vis de serrage
nombre de vis
Couples de serrage
lowering
design changes under reserve
030272006; 030272005; 030272002; 030272001
M 12
min. 8.8
70 Nm
030272006; 030272005; 030272002; 030272001
M8x12 DIN 913 A2-70
Lifting the load by turning the crank in clockwise
direction.
Lowering the load by turning the crank in counter-
clockwise direction.
changements techniques sous réserve
04.04.013
3
2
20 [Nm]
10

Publicité

Table des Matières
loading

Table des Matières