List Of Supplied Components; Receipt And Unpacking - Olimpia splendid Sherpa Aquadue S2 E Small Instructions Pour L'installation, L'emploi Et L'entretien

Masquer les pouces Voir aussi pour Sherpa Aquadue S2 E Small:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

List of main components of the internal unit (Fig.4)
1.
Bearing structure
2.
3 bar safety valve
3.
Main circuit heat exchanger
4.
Expansion vessel
5.
Reheating electric heaters collector
6.
Conditioning circuit circulation pump
7.
Three-way valve
8
Electric panel assembly
9.
Touch screen display

1.3 - LIST OF SUPPLIED COMPONENTS

The appliances are shipped with standard packaging composed of an enclosure and cardboard corners and
a series of expanded polystyrene guards.
Under the units packaging is located a small pallet which eases transport and displacement operations.
Inside the packaging, together with the internal unit, the following components are supplied:
Wall bracket for appliance anchoring
Template for installation
Domestic hot water temperature probe to be inserted in the accumulation tank
External air sensor kit
• Y-shaped filter

1.4 - RECEIPT AND UNPACKING

The packaging is made up from suitable material and performed by expert personnel.
The units are delivered complete and in perfect condition. However, for he quality control of the transport
services, follow the warnings below:
a. On receipt of the packages, check whether the packaging is damaged. If this is the case, withdraw the
goods with reserve, producing photographic proof and any apparent damage.
b. Unpack, checking the presence of the individual components with the packing lists.
c. Control that all components have not undergone damage during transport. If this is the case, inform the
carrier by registered letter with acknowledgement of receipt within 3 days of receiving the goods, presenting
photographic documentation.
d. Pay attention when unpacking and installing the equipment.
Sharp parts can cause injury. Pay particular attention to the edges of the structure and the fins of
the condenser and evaporator.
No information concerning damage undergone can be taken into consider-
ation after 3 days from delivery.
For any controversy the court of jurisdiction will be BRESCIA.
Keep the packaging for at least the duration of the warranty period, for any shipments to the after-sales
centre for repairs. Dispose of packaging in compliance with the regulations in force regarding waste dis-
posal.
EN - 16
10. Compressor
11. Expansion valve
12. DHW circuit heat exchangers
13. DHW circuit circulation pump
14. DHW circuit evaporator water flow adjuster
15. Water circuit manometer
16. Flow switches
17. Automatic air vent valves
18. Support for wall mounting

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sherpa s2Sherpa aquadue tower s2

Table des Matières