Mounting And Installation - Dantherm CDF 35T Série Manuel D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Mounting and installation

Measuring of ducts Cut out the stencil from the packaging and tape it onto the wall where you want the unit
to hang. Use the stencil to mark off the position of the ducts and the suspension bar.
You may also use the dimensional outlines on page 62 to make the markings.
Having made the duct openings, measure the depth of the ducts. The ducts are now
ready for adjustment and installation.
Note!
The suggested minimum space between unit and ceiling and between unit and floor is
225 mm.
See the dimensional outlines page 62
Duct kit
The duct kit is suitable for
wall thicknesses from 70 to
350 mm
The duct kit includes the
parts shown below:
CDF 35T
CDF 45T
The duct piece with the filter is placed in the lower duct opening where the humid air
from the room is taken into the unit.
If the wall is between 130 and 350 mm thick, the center piece of the duct kit is
shortened to the required length before assembly.
The center piece of the duct kit – 235 mm
When the duct kit has been installed in the duct openings, the unit is hung up on the
rail.
Product
C
434 mm
743 mm
Duct kit
Filter
Duct kit - 350 mm
Continued overleaf
19

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Cdf 55t sérieCdf 35Cdf 45

Table des Matières