Mounting and installation instructions
Introduction
Measuring the
ducts
Important
Duct kit
The duct kit
includes ...
24
This topic contains all necessary information to be able to mount the duct kit and the
dehumidifier correctly.
The electrical installation is described at the end of this section.
Please follow this procedure to establish the ducts:
Step
1
Cut out the stencil from the packaging and tape it onto the wall where you
want the unit to hang
2
Use the stencil to mark off the position of the ducts and the bar for
suspension of the dehumidifier
You may also use the dimensional outlines on page 75 to make the
markings
3
Establish the duct openings
4
Measure the depth of the ducts
5
Adjust and mount the ducts according to the Measuring in step 4, see also "
Mounting of the duct kit"
The suggested minimum space between unit and ceiling and between unit and floor is
225 mm.
See the dimensional outlines on page 75.
The Dantherm Air Handling duct kit is suitable for wall thicknesses from 70 to 350 mm
The duct kit includes the parts shown below:
Action
Duct kit
Model
CDP 35T
CDP 45T
CDP 65T
C
434 mm
743 mm
1284 mm
Continued overleaf