Connecting the consumption grid

9.4. Consumption grid connection process

To connect the consumption grid:
1.
Loosen the packing gland marked LOADS (see section "2.7. Description of cable inlets"), remove the cap
and pass the consumption grid cable through it.
2.
Use two of the ferrite cores supplied with the unit and make two turns with the L and N wiring from the
storage system.
3.
Connect the push-in type terminals marked as J56 LOADS, respecting the polarities. The operation of
this type of terminal is described in "7. Connection/disconnection of wiring in push-in type terminals".
4.
Correctly tighten the cable gland to prevent losses to the protection class, verifying that the wiring is not
taut.
ABH2013IQM01_C - Installation and Operation Manual
Ingeteam
L
Live
N
Neutral
Ground
EN
ES
FR
PT
31