Cleaning And Maintenance - Futurelight LIS-69 RGB Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

• Press [MODE/ENTER] to enter editing for the selected channel , the fixture reacts to your settings. The
display shows the DMX value of the edited channel. Such as " 11XX", it stands for channel 11 of the current
scene, the DMX value is XX , XX is a hexadecimal number value "01-FF".
• Adjust the desired DMX value by pressing [UP] or [DN].
• Press [MODE/ENTER] in order to edit other channels of this scene.
• Repeat above steps until you finish setting all the DMX values for all channels of this scene.
• Once all the channels completed, the display will flash "TIME".
• Press [MODE/ENTER] to edit the time needed, the display shows "TXXX", "XXX" stands for the time
needed to run the current scene, value "001-999". For example, "T002" means you need 0.4 ms (002 x 0.2
ms) to run the current scene.
• Adjust the desired time by pressing [UP] or [DN].
• Press [MODE/ENTER] to save the settings for the scene you are editing, the display will change to the next
scene automatically.
• Repeat above steps to edit and other scenes, you can edit and save a maximum of 48 scenes.
• Press [EXIT] to exit. The number of steps can be defined under "STEP" and the scenes can be called up
under "RUN"
b) Editing via the external controller
• Call up the first scene in your controller now.
• Select "SC01" by pressing [UP] or [DN].
• Press [MODE/ENTER], the display shows "SC01".
• Press [MODE/ENTER], the display shows "C-01".
• Select "CNIN" by pressing [UP] or [DN].
• Press [MODE/ENTER], the display shows "OFF".
• Press [UP], the display shows "ON".
• Press [MODE/ENTER], the display shows "SC02". You successfully downloaded the first scene.
• Adjust the Step-time as described above.
• Call up the second scene in your controller now.
• Repeat steps 5-11 until all desired scenes are downloaded.
• Press [EXIT] to exit. The number of steps can be defined under "STEP" and the scenes can be called up
under "RUN"

CLEANING AND MAINTENANCE

The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) Mechanically moved parts like axles, eyes and others must not show any traces of wearing (e.g. material
abrading or damages) and must not rotate with unbalances.
4) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.
We recommend a frequent cleaning of the device. Please use a moist, lint-free cloth. Never use alcohol or
solvents!
DANGER TO LIFE!
Disconnect from mains before starting maintenance operation!
43/87
00031008.DOC, Version 1.0

Publicité

Table des Matières
loading

Table des Matières