Modine MCV Série Manuel D'installation Et De Maintenance page 43

Table des Matières

Publicité

START UP CHECKLIST & REPORT – Direct Gas-Fired Make-Up Air Units
INITITAL INSPECTION (continued)
Gas Manifold & Vent Piping
1.
Manifold Assembly and Components Tight and Securely Mounted
2.
Vent Screens Installed If Required
3.
Vent Piping Run to Outdoors (some indoor models)
4.
Tighten Fittings and Components as Necessary
Comments:__________________________________________________________________________________________
Filters
1.
Filters Installed Properly
2.
Type:
Aluminum
Comments:__________________________________________________________________________________________
Electric Service
1.
Electrical Service Provided to Unit:
2.
Unit Nameplate Electrical Requirement: ____ Volts
3.
Terminal Strip Wires Tight:
4.
Componentry and Relays Mounted Securely in Place
5.
Fuse Size (fused disconnects): ____ Volts ____ Amps
6.
Overload Heater Size ____________
7.
The Unit has been grounded by the installer at the main unit panel
Comments: __________________________________________________________________________________________
Gas Service (see maximum and minimum gas pressure requirements on unit rating plate)
1.
Supply Gas Type:
2.
Service Pressure: ____
3.
Manual Gas Shut-off Cock in line-of-sight:
4.
Handle Present on Manual Shut-off Cock:
Comments: __________________________________________________________________________________________
When complete with the Initial Inspection, proceed to the Verification of Operation section.
Pleated MERV 8
Pleated MERV 13
____ Volts
____ Phase
____ Phase
Natural Gas
LP Gas
"WC
Oz
PSI
7
5 -
5
2
0 .
7-510.1
Other _____________________
____ Hertz
_____ Amps
____ Hertz
_____ Amps
Main Panel
Remote Panel
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
No
Yes
No
3
43

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mvv sérieMcvMvv

Table des Matières