4 WARNINGS FOR INSTALLATION

Installation must only be carried out by qualified people and in accordance
with installation country rules.
The installer MUST ALWAYS respect the following warnings:
PLACE the receiving unit so that the output terminal block is always facing up.
DO NOT MODIFY or TAMPER WITH the radio remote control, the machine or its
electrical panel. DO NOT PERFORATE the receiving unit in any case.
WHEN WIRING, all standards about electrical panel and the relevant national
regulations must be complied with. Follow the instructions and warnings given
in chapter "Installation" on page 26.
DO NOT BYPASS the radio remote control safety devices and/or those present
inside the machine.
RESPECT the EN60204-32 (for hoisting machines) and/or EN60204-1 prescrip-
tions (for machines).
Always INSTALL the receiving unit inside electrical panels.
USE electrical panels that guarantee an IP54 protection degree or higher (level
IP65 is recommended if the panel is outdoors).
INSTALL the receiving unit far from any device that can generate electromag-
netic fields or heat (e.g. transformers, motors, radio transmitters).
REMEMBER to carefully wire the SAFETY contact in series with the movement
commands inside the receiving unit.
After installation and wiring, ALWAYS CHECK that the manoeuvres carried out
are exactly the same as the commands given (in particular check the STOP
command).
When soldering on the machine, REMOVE POWER SUPPLY by disconnecting
all the electric connections (both during installation and during normal opera-
tion).
The presence of vibrations can compromise receiving unit performance: it is therefore sug-
gested to use suitable vibration dampers.
Mounting the antenna is also included in the installation operations (for instructions
and warnings refer to paragraph 6.3 "Antenna assembly").
The installer must CHECK and/or FILL IN the "Technical Data Sheet", indicating the date
the system has been put into service, signing and stamping it.
LIE&LQU4-01 - eng.fm
4 - Warnings for installation
Page 23