Assembly; Maintenance; Maintenance Schedule - RedMax RA-EX850 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

To assemble the two-piece shaft
1. Turn the knob to loosen the coupling.
2. Align the tab of the cutting attachment (A) with the
arrow of the coupling (B).
B
3. Carefully push the shaft into the coupling until you
hear a click.
4. Tighten the knob fully.
Introduction
Below you will find some general maintenance
instructions. If you need further information please
contact your service workshop.

Maintenance schedule

Below is a list of the maintenance steps that must be
done on the cutting attachment.
8

Assembly

To disassemble the two-piece shaft
1. Turn the knob 3 turns or more to loosen the
A
2. Push and hold the button (C).
3. Hold tight in the end of the shaft that the engine is
4. Pull the attachment straight out of the coupling.

Maintenance

Note: The operator must only do the maintenance and
service on the cutting attachment that is given in this
operator's manual. Other maintenance and service must
be done by an approved service workshop.
coupling.
attached to.
C
1139 - 001 - 03.04.2019

Publicité

Table des Matières
loading

Table des Matières