10. CONNECTION OF THE AIR DUCT
D2 dimensions depend on unit.
11. DIAGRAMME DES FLUX
PV
- вventilateur d'air neuf
KE
- Batterie de chauffage électrique
PF
- filtre de l'air neuf
* Fonction de purge supplémentaire
12. RECOMMANDATIONS POUR LA MISE EN ROUTE
12.1. RECOMMANDATIONS AVANT MISE EN ROUTE DE L'APPAREIL (AVANT L'UTILISATEUR FINAL)
Prior to start-up the system must be thoroughly cleaned. Check whether:
• operation systems and unit elements as well as automation and automation devices were not damaged during installation,
• all electrical devices are connected to power supply and fit for service,
• all necessary automation elements are installed and connected to power supply and terminal blocks,
• cable connection to terminal blocks comply with the existing power connection diagrams,
• all electrical equipment protection elements are properly connected (if they are additionally used),
• cables and wires correspond to all applicable safety and functional requirements, diameters, etc.,
• earthing and protection systems are properly installed,
• condition of all seals and sealing surfaces are proper.
VEKA 350 EC v2019.06
Figure 9.0.2. under the ceiling installation
Figure. 10.1.
Figure. 11.1.
ODA - outdoor air; SUP - supply air.
Circular air duct conection
Indication for duct connection.