All manuals and user guides at all-guides.com
Position selector circulator OPERATION ( In function
•
MAX
First functioning operation of heating installation
During the first hour of functioning, we recommend to employ the equipment on power 1
( minimum ) this to check the functioning of the entire heating installation to avoid that
"particular" temperatures are reached.
Connection to the chimney
Before connecting the appliance, verofy if the technical data reported on the technical
•
correspond to the ones you have required at the moment of purchaser.
All heating biomass equipments, especially wood and pellet stoves, have to evacuate the
•
combustion products in a flue, which must be built in conformity with normative in
force.
The following instructions describe „ informations for a good installation „ and they refer
•
to normatives in force, but they are not to be considered exhaustive for installations laws.
IT IT IT IT- - - - GB
GB- - - - FR
FR mod. 698 TPC– 698 TP-SAC
GB
GB
FR
FR
When the venting phase is finished, the
circulator selector has to be placed in the
same position as in the picture. (Rotate
clockwise at the stroke end).
46/116
)