All manuals and user guides at all-guides.com
Preliminary operations
Take away the packing
•
Before installation, check the appliance integrity. In case of doubt, do not use the
•
appliance and call the dealer.
Packing materials is for recycle, getting it in the specify container
•
Appliance positioning
The installation room should have :
•
A suitable floor for stove weight. Should the existing construction not satisfy this
−
requirement, necessary measurements must be taken (I.e. a plate for the distribution
of the weight)
A suitable floor for stove calorific radiation, which grants against fire risks.
−
The installation of the appliance should grant an easy access for the cleaning
−
operations of the appliance itself, as well as of gas exhaust ducts and of the
chimney.
A minimal distance from flammable materials (see security distances)
−
The room must be continuously ventilated according to the local rules.
−
FLOOR PROTECTION
The equipment must be installed on a non–combustible surface. In case of flammable floor (as
wood, moquette, etc.) is necessary to prepare a protective base of the floor (sheet steel,
ceramic or other) with the following dimensions:
Hold up in front ≥ 500 mm;
−
Hold up lateral ≥ 300 mm;
−
Hold up back
−
SECURITY DISTANCES
From NOT combustible object :
•
A > 600 mm B > 150 mm
−
From combustible object and from principal wall in
•
reinforced concrete :
A>600 mm B>300 mm C>50 mm D>1000 mm
−
The minimal distance between the stove and every
•
objects over it must be at least 1 mt
≥ 100 mm
C > 50 mm D>1000 mm
43/116
IT IT IT IT- - - - GB
GB- - - - FR
FR mod. 698 TPC– 698 TP-SAC
GB
GB
FR
FR