INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Tools needed for gas installations:
_——->
Al fA)
uO
8" or 10" adjustable wrench
(for gas connections)
8" or 10" pipe wrench
Flat-blade screwdriver
Stee
1/4" nut driver
(recommended)
Level
Tape measure
Pliers
Co
SES
Utility knife
Tin snips (new vent
installations)
qo
(new vent installations)
Caulking gun and compound
—_>———
Min. 8" long Torx® T25
screwdriver
(for door reversal only)
® TORX is a registered trademark of Acument Intellectual Properties, LLC.
4
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Pipe-joint compound
resistant to LP gas
Parts supplied:
Parts package is located in dryer drum. Check that all parts
are included.
NOTE: Do not use leveling legs supplied with dryer if installing
on a pedestal.
fe
4
2
SZ
Leveling legs (4)
— |
Short inlet hose
Rubber washers
"Y¥" connector
ES
Long inlet hose
Parts needed: (Not supplied with dryer)
@ Vent clamps
@ Vent elbows and ductwork
Additional parts may be required, depending in your installation.
Check local codes. Check existing electrical supply and venting.
See "Electrical Requirements" and "Venting Requirements"
before purchasing parts.