Télécharger Imprimer la page

Humanscale M21TBB Instructions De Montage page 4

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
Bolt-Through Mount
1
Drill 1/2" hole through work surface in desired location.
NOTE: Bolt-Through Mount can accommodate a hole up to 4" (102mm)
in diameter. If hole is 2" (51mm) or more, cables can be routed through
the hole. For some 2" grommet holes, cables should be routed before
installation of mount to accommodate cable plugs (cable access is
approximately 1.5" x 0.25" with 2" grommets).
2
Position the M2.1 Base over the work surface hole (J).
3
Align Bolt-Through Plate (K), foam side up, under the work surface.
Pass the Bolt (L) through the hole in the plate and screw into M2.1
base by using 8mm hex key.
Smart Stop Adjustment
In each arm connection, there is an adjustable Smart Stop Ring which
can be positioned to limit the arm's range of motion. Depending on the
orientation of the ring the arms can be set to rotate either 90°, 180° or
360°. The marked angle will be in the center of the range of motion. The
stop rings must be configured in such a way that the dynamic link head
does not pass behind the rear edge of the unit.
4
J
K
L
Arm can rotate without
stopping
Arm can rotate 180˚
Arm can rotate 90˚

Publicité

loading

Ce manuel est également adapté pour:

M2.1