Télécharger Imprimer la page

Parkside HG05659 Instructions D'utilisation Et Consignes De Sécurité page 9

Publicité

The pressure must not fall more than ap-
prox. 0.5 bar in a space of 30 minutes.
Pump the pressure sprayer to approx.
2 bar.
Pull the safety valve
You must be able to hear the pressure
escaping.
Bringing into use
Attaching the spray tube
(Fig. B)
Turn the union nut
release it from the handle
union nut
on the spray tube
10
then push the spray tube
handle
as far as it will go.
11
Tighten the union nut
clockwise.
Filling the pressure
sprayer tank (Fig. D)
Note: Before using the product, check to see
that it is in good condition and free of defects.
Press the pump handle
and turn it anticlockwise.
Note: Before you open the tank, pull
the safety valve
any residual pressure still present in the
container
.
5
Draw the pump
2
Now fill the tank.
Note: Fill the tank with only the amount
of liquid that you actually need for that
particular spraying session (not more
than 5 l).
up to the stop.
3
anticlockwise to
10
. Put the
11
and
8
into the
8
by turning it
10
downwards
1
upwards to release
3
out of the container
5
Place the pump
tainer
and turn the pump handle
5
clockwise as far as it will go.
Building up the
operating pressure
Push the pump handle
wards and release it by turning it out of
the recesses.
Move the pump handle
until the pressure sprayer has been
pumped up to a pressure not exceeding
the maximum permissible operating
pressure of 2.5 bar. To ensure this value
is not exceeded, monitor the pressure
gauge
during the pumping process.
4
Note: If the pressure of the air in the
container
5
sure is automatically released through
the safety valve
Press the pump handle
into the recesses.
Now take the spray tube
holder.
Spraying
Hang the pressure sprayer over your
shoulder by the carrying strap
Note: Ensure that the pressure sprayer
is always kept upright. Only when held
.
in this orientation will the sprayer work
properly.
Hold the spray tube firmly by the handle
and direct the adjustable spray noz-
11
zle
e.g. at a plant.
7
Press the trigger
process.
back into the con-
2
slightly down-
1
up and down
1
exceeds 2.5 bar, the pres-
.
3
downwards
1
out of the
8
.
6
to start the spraying
13
GB/IE/NI
1
9

Publicité

loading

Ce manuel est également adapté pour:

344878 2004