4.2. Installation of the electrolysis cell
The electrolysis cell is made of a transparent polymer in whose interior the electrodes are placed.
The electrolysis cell must be always installed indoors and after the pool filter, and after any other
equipment that may be present (heat pumps, control systems, etc.).
The installation of the cell should allow easy access to the installed electrodes by the user. It is
highly recommended to install the electrolysis cell in a place of the pipe that can be easily isolated
from the rest of the installation by two valves, so that the tasks of maintenance can be carried out
with no need of draining of the swimming pool.
Where the cell is installed on a by-pass (recommended option), a valve to regulate the flow must be
introduced. Prior to installation, please consider the following commentaries:
Fig. 2
1. Flow direction marked in
the cell must be respected.
Recirculation system must
guarantee the minimum
flow stated in the Table of
Technical Specifications for
each model (see Section 8).
Fig. 3
2. The system flow detector
activates if there is not
recirculation (flow) of water
through the cell or if flow is
very low. If electrolysis gases
are not properly removed
through the electrolysis cell,
the generated gas bubble
electrically isolates the
auxiliary electrode (electronic
detection). The safest
orientation is shown in the
recommended installation
diagram.
29
Fig. 4
3. WARNING: if the in-out
valves of the electrolysis cell
are closed simultaneously,
the flow detector (gas
detector) will not work
correctly, with the consequent
risk of cell breakdown.
Although this situation is
extremely unusual, it can
be easily avoided once
the equipment has been
installed, by locking
at opened position
the return valve to the
swimming pool, so it cannot
accidentally be manipulated.