13
ASSEMBLY
13.1
Requirements to the working area
The machine should be positioned in such a was as to provide enough free area around it for a
safe operation
The pre-selected place for positioning the machine should provide convenient connection to the
electric mains and the suction facility. Provide proper illumination /500 lux /, which will not blind
the eyes and avoid stroboscopic effect.
Check the load-carrying capacity of the floor taking into consideration that the machine should be
leveled on its supporting points at the same time.
Besides that a distance of 0.8 m at least should be ensured around the machine.
You must ensure suitable space for infeed and out-feed of long workpieces at machine's front and
rear side.
13.2
Unloading of machine
The machine is transported packed in wooden case following the requirements of the Bulgarian
State Standard 5777-75. In order to avoid damages on the components jut out and to spare
some place in the case, the machine is partly disassembled.
The locations where hoisting and transportation ropes should pass through are marked on the
package.
The hoisting and shifting of the machine must be carried out by suitable personnel especially
trained for that kind of work and disposing of the required equipment.
WARNING
During loading and unloading operations the machine must be handled with extreme
precaution and hits and pushes must be avoided in order to prevent injury of personnel
and damage of the goods.