2.3 Red loading trigger
In some cases we may need to bridge the gap between the rail and the stretcher, for which
purpose the red trigger has been designed. It is operated upwards and allows the entire rail
assembly to be moved by approx. 20 cm.
REV 1
05-24
Instruction manual
SILVER+ R-1200
29