Télécharger Imprimer la page

Candy CUTCE64EXFDF Manuel De L'utilisateur page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5.3 WIRING AND SAFETY OF THE BUILT-IN
COMBINED OVEN
•Before making the connection, make sure that the installation is
protected by a suitable fuse, see table, and that it is fitted with
wires of a large enough section to supply the appliance normally.
Turn over the oven / hob, glass side against the work top, taking
care to protect the glass.
•Open the cover in the following sequence;
Figure 12
• Unscrew the cable clamp "1",
• Find the two tabs located on the sides,
• Put the blade of a flat screw-driver in front of each tab "2" e "3",
push in and press,
• Remove the cover.
To release the power supplying cord.
• Remove the screws retaining the terminal block which contains
the shunt bars and the conductors of the supply cord,
• Pull out the supply cord.
•Operations to be carried out to make a mew connection:
-Choose the power supply cable in accordance with the
recommendations in the table.
-Pass the power supply cable in to the clamp.
-Strip the end of each conductor of the supply
cord on a 10 mm length, by taking in account
the requested length of the cord for the
connection to the terminal block.
-According to the installation and with the help
of shunt bars which you should have recovered
in the first operation, fix the conductor as
shown on the chart.
-Fix the cover.
-Screw the cable clamp.
Note: make sure the terminal board screws are
tight.
LAY OUT
"1-3-5"
MONOPHASE or TWO PHASES 220-240 V
Cable
3x4 mm
HO5V2V2F
THREE PHASES 220-240 V
Cable
4x1,5 mm
HO5V2V2F
THREE PHASES 380-415 V
Cable
4x1,5 mm
HO5V2V2F
L1 / L2 / L3 = Phase
Figure 13
Figure 14
Figure 15
LAY OUT
"2-4"
~
2
3x4 mm
2
3~
2
4x1,5 mm
2
2N~
2
4x1,5 mm
2
N = Neutral
PE = Earth
5.4 VITROCERAMIC HOB WITHOUT
CONTROL KNOB
Connection to the electrical circuit on glass ceramic hob shall be
made only via the oven.
To proceed with the connection, it is necessary to joint
male connectors
"female" connectors 3 of the oven or of the control panel.
Figure 17
This connection can be made before or after the oven is
screwed into place.
SHUNT
Figure 16
10 GB
1
and
2
of the hob with the
INSTALLATION WITH OVEN
HOB
OVEN
550x10
Bult-in oven "apertures" : Refer to the
instructon booklet concerned.

Publicité

loading

Ce manuel est également adapté pour:

Cutc64exdnfCutc64exdffHct615x/eHct615xl/eHct617x/eHct827xl/e