LIFTING PROCEDURES
max. 8°
EN:
When manoeuvring the product out of the packaging to the pipe surface, please ensure that the proper lifting
procedures are followed. Ensure that local safety and lifting procedures are adopted. All lifting should be done by
qualified personnel, with approved equipment.