MODELS
This manual describes the installation,
operation and maintenance of the X-
100/B/C/V, X-120/B/C/V, S-100/B/C/V, S-
120/B/C/V dishwashers.
The model reference and its specifications
are shown on the identificacion plate
located in the machine.
Models "B": equipped with a drain pump
Models "C": equipped with an Air gap-Break
Tank, rinsing booster pump and drain
pump.
Models
"V":
equipped
condenser and heat recovery.
These machines have been designed and
manufactured in accordance with the
following European directives for safety:
89/392/EEC and 73/23/EEC.
These appliances comply with the EN55014
and
EN55104
standards
suppression and exemption of radio-
frequency interferences.
INSTALLATION
For optimum performance and long service
life of the machine, follow the instructions
contained in this manual rigorously.
W
ATER CONNECTION
Before proceeding with the installation of
the machine, check and make sure that:
1. The mains water connection is within
1.50m from the foreseen location of
dishwasher.
2. At its end on the machine side, the water
supply connection is equipped with a 3/4"
GAS stopcock for the coupling of the water
supply hose supplied with the machine.
3.1 X-100/B, X-120/B, S-100/B, S-120/B
The dynamic pressure of the water
supplied to the machine is not less
than 2 bar (200kPa) and not greater
than 4 bar (400kPa).
3. 2 X-100C, X-120C, S-100C, S-120C The
dynamic
pressure
of
supplied to the machine is not less
than 0.7 bar (70kPa) and not greater
than 4 bar (400kPa).
3.3 X-100V/BV, X-120V/BV, S-100V/BV, S-
120V/BV The dynamic pressure of the
water supplied to the machine is not
less than 2.5 bar ( 250kPa).
4.1 X-100/B, X-120/B, S-100/B, S-120/B
Inlet water flowrate is at least 15l/min
4.2 X-100C, X-120C, S-100C, S-120C Inlet
water flowrate is at least 7l/min..
5. For good washing results, the hardness
of water (lime) must not exceed 10
hydrotimetric degrees.
6. In places where the water pressure is
6
EN
higher than the specified one, it will be
necessary to incorporate a pressure
reducer to bring the service pressure
within the limits of 2 to 4 bar (200 and
400kPa).
7. If the water pressure is less than 2 bar, it
will be necessary to install a pressure
booster (X-100/B, X-120/B, S-100/B, S-
120/B).
8. Avoid bottlenecks with hoses when
making this installation.
9. On
models
connect the drain pipe of an O.D. of
with
steam
30mm to the sewage system. The
distance from the sewage system to the
machine base shall not exceed 280mm.
10.On models "B" and "C" equipped with a
drain pump, the distance from the
sewage system to the machine base
shall not be greater than 1m.
11. In order to ensure complete drainage,
it is essential that the machine is even.
for
the
To level it, undo or screw in the
levelling feet.
12. Models "C": The inlet solenoid valve
includes a flowrate controller different
from the standard model, as stated on
the spare parts list. This model is
capable of operating at an input water
pressure ranging from 0.7 to 4 bar and
a minimum supply of 7l/min.
13. Inlet water temperature: To achieve the
output
specifications table, the temperature
should be 50ºC (60ºC as a maximum).
With the "Thermal-lock" feature, the
machine cycle time grows longer as the
inlet water tempereature decreases.
M
ACHINE INSTALLATION WITH A WATER SOFTENER
If the lime content of the water is greater
than 10 degrees of hardness, install a
SAMMIC water softener. The installation
instructions of this device come with it.
Avoid bottlenecks before and after this
installation as flow would be reduced
producing loss of pressure.
M
ACHINE INSTALLATION WITH A BOOSTER PUMP
the
water
· X-100/B,
Where the inlet water pressure is lower than
2 bar (200kPa), install a booster pump.
The booster pump may be installed
anywhere near the machine, approaching
the water piping and corresponding 3/4"
cock to the device. Ensure that the water
cock is still accessible.
Connect one end of the booster pump to
the water cock and the other end to the
hose supplied with the machine.
· X-100C, X-120C, S-100C, S-120C Since the
machine includes a rinse pressure pump, it is
not necessary to install a booster pump.
with
gravity
drainage,
shown
on
the
product's
X-120/B,
S-100/B,
S-120/B
E
LECTRIC INSTALLATION
Single-phase machine: X-100, S-100
1. Check whether the voltage of the
machine coincides with the mains
voltage.
2. Install a 40A (1P+N) switch of the
magnetothermal type. The machine is
equipped with a cable of a cross section
of 3x6mm² and 2m in length. This cable
must be connected directly to the switch.
Three-phase machines: X-100, X-120,
S-100, S-120
1. Check whether the voltage of the machine
coincides with the mains voltage. Series-
production
machines
are
prepared with a 400V/3N connection.
2. Install a 25A (3P+N/400V) or 35A
(3P/230V) magnetothermal switch. The
machine is equipped with a cable of a
cross section of 5x6mm² and 1.70m in
length. This cable must be connected
directly to the switch.
3. If the motor rotates in the opposite
direction (producing abnormal noise on
model X-120), it is necessary to invert
two phases of the power supply.
4. Changing connections for a 230V/3-
phase supply:
· Disconnect the neutral (blue wire) of the
power cable from the connecting strip.
· Connect the bridge to the connecting
strip as shown on the wiring diagram.
· Change the connections at the heating
resistor of the boiler and at the heating
resistor of the tank, placing the bridges
included in the supply as shown on the
wiring diagram.
· Change the connections in the motor
terminal box.
· EARTHING is OBLIGATORY. Moreover,
the machine includes an external screw
for
its
connection
to
equipotential system.
OPERATION
OF
THE
CONTROLLER
Technical description of the control
panel: Figure A
M
(2)
AIN SWITCH
D
(2)
ISPLAY
When the machine is powered up with main
switch
(1),
the
selected
configuration number appears on the
delivered,
a
ground
ELECTRONIC
machine