Télécharger Imprimer la page

Graf EcoBloc Inspect smart Notice Pour L'installation, L'utilisation Et L'entretien page 29

Masquer les pouces Voir aussi pour EcoBloc Inspect smart:

Publicité

Les langues disponibles

Les langues disponibles

mail@graf.info
www.graf.info
7. Installation
7.4
Positioning the infiltration ditch elements
The infiltration ditch elements are placed in the
base plate. The EcoBloc connecting elements are
also used in each layer.
The EcoBloc Inspect smart is preferably laid with
the inspection channel (open side) lying length-
ways.
EcoBloc Inspect smart modules must be con-
nected to the adjoining modules using connectors.
The subsequent layers of modules are connected
to the existing modules as shown.
The modules must be arranged unidirectionally,
aligned congruently with the inspection tunnels.
The integrated arrangement of catches dictates
that the modules can only be positioned in the cor-
rect direction.
The end plates are then fitted; these simply snap
into the existing opening on the EcoBloc Inspect
smart. The end plates must be inserted so that the
GRAF logo is aligned with the writing direction. DN
110, DN 160 or DN 200 connections can be pro-
duced for inlets on the EcoBloc end plate. A rotary
cutter, keyhole saw or similar tools are suitable for
cutting out the connections.
29 / 72

Publicité

loading

Ce manuel est également adapté pour:

402500