Télécharger Imprimer la page

PYD Electrobombas SP Serie Instructions D'utilisation Et Maintenance page 44

Publicité

Les langues disponibles

Les langues disponibles

OPERATING AND MAINTENANCE MANUAL
SOLAR PUMPING GRUOP
6. FUNCTION TEST
6.1. Key verification project before running the test
Tighten all screws, tighten terminals before running.
Check all terminal connections.
Make sure that there is no possibility of short circuit.
6.2. Performance test method
1
2
3
Remark: 1. If the water level sensors are not used, short COM1 and WH to run the system.
BRIDGING OF THE PROBES, IF NOT USED:
If no tank is to be used, com2 and TH must be free.
If we are only going to use a probe for low well level (empty well)
Set the probe to COM1 AND "WH" the controller will ignore the WL.
If we are not going to install the empty well probe, COM1 must be jumpered with WL and WH.
If we are going to install 3 probes, (2 for the well and 1 for the tank)
Low well level: com1 and WL
Well water recovery level: com1 and WH
Tank full: com 2 and TH
www.proindecsa.com / proindecsa@proindecsa.com
Light
All lights flash once.
"POWER" light is on
"POWER + TMPPT" light on
44
Situación del sistema
Ignition
The system starts to
check itself.
The pump starts
working

Publicité

loading

Ce manuel est également adapté pour:

Th serieSt serie