OPERATING AND MAINTENANCE MANUAL
SOLAR PUMPING GROUP
+
-
+
+
-
+
+
In case of using a solar installation other than the one recommended,
PUMP VOLTAGE (V)
12V
24V
36V
48V
110V
150V
220V
300V
NOTES:
•
Performance information in the catalog refers to factory test results and is for your reference only.
The exact performance depends on circumstances such as solar irradiation, the specifications
of the solar installation or the efficiency of said installation. You should take into account some
possible difference in performance.
•
Please carefully read and understand the table above before making the installation connections.
•
Above all, the connection to a photovoltaic panel system that exceeds the required voltage should
be avoided.
www.proindecsa.com / proindecsa@proindecsa.com
+
-
+
-
-
-
+
-
+
-
Installation for 300V pump
1. Connect two sets of nine 35V panels in parallel.
2. Connect both sets to each other in series.
please follow these instructions strictly
SOLAR INSTALLATION (W)
≥1,3xPUMP POWER
≥1,3xPUMP POWER
≥1,3xPUMP POWER
≥1,3xPUMP POWER
≥1,5xPUMP POWER
≥1,5xPUMP POWER
≥1,5xPUMP POWER
≥1,5xPUMP POWER
+
+
-
+
-
+
-
+
-
+
VMP PEAK VOLTAGE (V)
≥15
≥30
≥45
≥60
≥112
≥150
≥220
≥300
35
+
-
-
+
-
-
+
-
+
-
VOC VOLTAGE (V)
<50
<50
<100
<100
<200
<250
<350
<450
-