Télécharger Imprimer la page

Bergstrom INTEGRAL POWER II Instructions De Montage page 26

Masquer les pouces Voir aussi pour INTEGRAL POWER II:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INTEGRAL POWER II
EN
Connect the return air sensor to the screw
15
terminals situated in the air inlet hole.
Place nut M6 (A) after the fixing nut of the
16
inner air distribution panel on each stud.
Place M6 hexagons screwing until 1 mm
above the upholstery. Unscrew nuts M6
(A) from this point until they meet the hex
spacers and tighten against them.
16
EPDM
seal
Cabin roof
Upholstery
Position the console with (4) M6/100x15 Allen
17
screws.
Base
(A)
M6 nut
M6 stud
1 mm.
M6 hexagons
15
16
1 mm
approx.
26
Base
Front attachment hexagon
(A)
Upholstery
Foam
Interior air
distribution panel
17

Publicité

loading

Ce manuel est également adapté pour:

1003714495