Télécharger Imprimer la page

Bergstrom INTEGRAL POWER II Instructions De Montage page 24

Masquer les pouces Voir aussi pour INTEGRAL POWER II:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INTEGRAL POWER II
EN
Connect the equipment wiring with inner
10
air distribution panel making the boxes and
colours coincide.
Place the inner air distribution panel on the
11
previous studs with (1) wide brimmed M6
washer and (1) M6 nut on each stud. Tighten
nuts until channelling duct meets with the
upper foam of the equipment.
Important: The foam channelling duct must
meet the upper foam of the equipment to
prevent air leaks.
11
EPDM
seal
Cabin ceiling
Upholstering
Position the console and align the unit. Once
12
aligned, remove the console.
Base
D
(A)
M6 Nut
M6 stud
1 mm.
M6 Hexagons
11
Rubber ductings
12
24
Foam
Interior air
distribution
panel

Publicité

loading

Ce manuel est également adapté pour:

1003714495