Cladding
If any FL2 variant cabinets are encased in a cladding, the cladding must be perforated with an opening (total hole
area) as follows.
•
600 mm cabinets: minimum opening 840 cm
900 mm cabinets: minimum opening 1260 cm
•
•
1200 mm cabinets: minimum opening 1680 cm
The perforation should not be located at or near floor level.
Note!
4.3. Taking cabinets into use
1. Clean all interior and exterior surfaces with a non-toxic, mild liquid detergent (pH 6-8) and a lint-free,
damp (not wet) cloth.
2. Dry all interior and exterior surfaces carefully.
3. H variants (heated cabinets) only: fill the water container with clean water.
4. Connect the cabinet to the mains and switch the power on.
The compressor and fans start operating.
5. Wait for 90 minutes or until the desired temperature is reached. The thermostat has been set to the
correct temperature at the factory.
The cabinet is now ready to be filled.
When multiplexing FL2 SF (self-service) cabinets, synchronise the defrosting cycle between
cabinets. Refer to wiring reference diagram E2421-3 for details.
Note!
EN DE ES FR PL RU NL FI SV NO DA EE LT LV
2
2
2
14