• BMS communication cable
T-BAT H 5.8
*Note: For the other end of the BMS communication cable connecting to the inverter, please refer to the
5
Installation Manual of inverter.
*Note: For the colour code wiring diagram of the BMS communication cable, please refer
to Page 88.
Installation of Cover Plate / Montage der Abdeckplatte / Installation de la plaque de
protection / Instalación de la placa de cubierta / Instalação de placa de cobertura
/ Installatie van de afdekplaat / Installazione della piastra del coperchio / Montaż
płyty osłonowej / Instalace krycí desky / Installation av täckplåt / Instalarea
plăcii de acoperire / Монтаж на покриваща плоча / Montering af dækplade /
Εγκατάσταση πλάκας κάλυψης / Katteplaadi paigaldamine / Kansilevyn asentaminen
/ Ugradnja pokrovne ploče / Fedél felszerelése / Dangtelio montavimas / Pārsega
plāksnes uzstādīšana / Inštalácia krycej dosky / Namestitev pokrivne plošče /
Kapak Plakasının Takılması / Instalação da placa de cobertura / ءاطغلا ةحول بيكرت
Cover plates needs to be installed on both sides. The installation steps are available for
both BMS and battery module.
Take the right side of T-BAT H 5.8 V2 as an example.
1
tighten
-
Y P L U G
R S 4 8 5 I I
T-BAT H 5.8 V2
-
Y P L U G
R S 4 8 5 I I
tighten
Clamp the cables into
the cover plate
95