Télécharger Imprimer la page

Napoleon BL56NTE Manuel D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

1.3
installation overview
9
10
Recommended installation steps:
1. Determine venting requirements before deciding the fi nal location of the appliance.
2. Install rough framing (refer to "rough framing" section).
note:
For Universal Heat Management installation steps, refer to the leafl et provided with the Universal Heat
Management kit. Start Universal Heat Management installation before placing appliance in its fi nal position.
3. Place the appliance in its fi nal position.
4. Install nailing tabs (refer to "nailing tab installation" section).
5. Install appliance venting (refer to "venting installation" section).
6. Install all electrical wirings (refer to "electrical information" section).
7. Install gas lines (refer to "gas installation" section).
8. Test appliance.
9. Complete framing (refer to "fi nish framing" section).
10. Finishing (refer to "fi nishing" section).
4
6
3
8
7
general information
1
2
5
EN
7
W415-3036 / 05.07.21

Publicité

loading

Ce manuel est également adapté pour:

Ascent linear serieBl56pte