fi nish framing
EN
9.2
fl ush
WARNING
!
•
Do not build into this area - it must be left clear to provide adequate clearance for the vent in this 14"
(35.6cm) wide area centered along the front of the appliance. The appliance should be in its fi nal location
before framing.
CEILING
G
44
W415-3036 / 05.07.21
H
MINIMUM
FROM
BASE
OF
APPLIANCE
B
B
G
A
H
14"
[35.6cm]
MIN
56 1/2"
39 3/8" (100cm)
18 9/16" (47.1cm)
60"
COMBUSTIBLE
HEADER
DRYWALL
A