6 START-UP
The start-up phase is very important to ensure maximum security and compliance to regulations, including all the requirements of EN
12445 standard which establishes the test methods for testing the automation for gates.
DEA System reminds that all installation, maintenance, cleaning or repair operations on any part of the system must be performed
exclusively by qualifi ed personnel who must be responsible of all texts requie by the eventual risk;
6.1 Installation test
The testing operation is essential in order to verify the correct installation of the system. DEA System wants to summarize the proper
testing of all the automation in 4 easy steps:
• Make sure that you comply strictly as described in paragraph 2 "WARNINGS SUMMARY";
• Test the opening and closing making sure that the movement of the leaf match as expected. We suggest in this regard to perform
various tests to assess the smoothness of the gate and defects in assembly or adjustment;
• Ensure that all safety devices connected work properly;
• Perform the measurement of impact forces in accordance with the standard 12445 to fi nd the setting that ensures compliance with
the limits set by the standard EN12453.
WARNING Using spare parts not indicated by DEA System and/or incorrect re-assembly can create a risk to people, animals and
property and also damage the product. For this reason, always use only the parts indicated by DEA System and scrupulously follow all
assembly instructions.
6.2 Unlocking and Manual operation
In the event of malfunctions or simple power failure, release the motor (Pic. 8) and perform the operation manually.
The knowledge of the unlocking operation is very important, because in times of emergency the lack of timeliness in acting on such
a device can be dangerous.
WARNING The effi cancy and safety of manual operation of the automation is guaranteed by DEA System only if the installation has
been installed correctly and with original accessories.
7 MAINTENANCE
Good preventive maintenance and regular inspection ensure
long working life. In the table below you will fi nd a listo f inspections/
maintenance operations to be programmed and executed periodi-
cally.
Consult the TROUBLE-SHOOTING" table whenever anomalies are
observed in order to fi nd the solution to the problem and contact
DEA System directly whenever the solution required is not provided.
Description
When the opening command is given, the leaf fails to move
and the operator's electric motor fails to start.
When the opening command is given, the motor starts but
the leaf fails to move.
The operator jerks during movement.
8 PRODUCT DISPOSAL
DISASSEMBLY
The automation unit must be dismantled by qualifi ed personnel, in accordance with the current accident prevention and safety
regulations, and with reference to the installation instructions, but in the reverse order. Before initiating the disassembly operations,
disconnect the electrical power and make sure it cannot be reconnected.
DISPOSAL
The automation unit must be disposed of in accordance with the current local and national waste disposal regulations. The product (or
its individual parts) must not be disposed of together with other household waste materials.
WARNING In line with EU Directive 2012/19/EG for waste electrical and electronic equipment (WEEE), this electrical product must
not be disposed of as unsorted municipal waste. Please dispose of this product by returning it to your local municipal collection
point for recycling.
INTERVENTION TYPE
cleaning of external surfaces
checking of screw tightening
checking of release mechanism operation
greasing of articulated joint
TROUBLE-SHOOTING
The operator is not receiving correct power supply. Check all connections, fuses, and the
power supply cable conditions and replace or repair if necessary.
Check that the unlocking system is closed (see Pic.8).
Make sure that the electronic device for electric power adjustment is in good condition.
If the piston remains at the complete end of its stroke when the gate is closed, review the
assembly procedure.
If the leaf does not move freely, release the ram and readjust the rotation points.
The power of the gear motor may be insuffi cient for the characteristics of the gate's wing;
check the choice of model whenever required.
The operator's front and rear attachments bend or are not fastened correctly. Repair or re-
place.
Possible solutions
LOOK
PERIODICITY
6 months
6 months
6 months
1 year
15