Télécharger Imprimer la page

Lamborghini Caloreclima EM 9/2-E Notice D'installation Et D'entretien page 32

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 44
INSTALLATION ONTO THE BOILER
Fix flange 2 to the boiler using 4 screws 3 interposing the insulation gasket 4 and the possible
insulating cord 5. Insert the burner in the flange so that the draught tube penetrates into the
combustion chamber by the length suggested by the boiler manufacturer. Tighten screw 1 to
lock the burner in position.
FLAME DIMENSIONS
A Flame diameter
B Flame length
C Test tube diameter
D Test tube length
UK
32
The dimensions are indicative only being
influenced by:
- excessive quantity of air;
- combustion chamber shape;
- development of gas path in the boiler (di-
rect/reverse);
- combustion chamber pressure.
M
M

Publicité

loading