Télécharger Imprimer la page

Broan Powerpack Inserts PM400SS Instructions D'installation, D'utilisation Et D'entretien page 10

Publicité

Les langues disponibles

Les langues disponibles

PREPARE THE CABINET (
7 . Measure the distance between both bottom bracket
edges (F) (FIG . 11) . The table below shows the approriate
distance needed .
u
nit
PM400SS
BBN2243SS
BBN2303SS
If the measured distance needs to be shortened, screw two
no . 8-32 x 1/4" machine screws, in each bottom embossed
cabinet brackets hole; this will slightly bend the bottom part
of the brackets (FIG . 12) . Screw both brackets until the
appropriate distance is obtained .
BBn2243SS
(
optional
8 . There are 7 different sizes of optional fillers (sold separately)
designed to fit up to 15-in . depth cabinets (for BBN1243SS
unit: HADTBN24, for BBN1303SS: HADTBN30) . Choose
the filler that fits better to cover the back bottom edge of
the cabinet . Use 4 no . 6 x 1/2" truss head wood screws
(included in the optional kit) to mount it (FIG . 12) .
Never use an electric screwdriver or drill to screw the
filler to the bottom edge of cabinet; use a standard
screwdriver .
h
orizontal exhauSt inStallation only
This powerpack insert is factory shipped to exhaust vertically;
however, it is possible to make it exhaust horizontally (3¼" x 10"
ducting only) .
9 . Cut the hole for the horizontal exhaust through the back
wall of the cabinet using the dimensions shown . (FIG . 14) .
10
n
arroW eDge
F
From 19-3/8"
to < 19-9/16"
F
From 21-7/8"
to < 22-1/16"
F
From 27-7/8"
to < 28-1/16"
BBn2303SS
a n d
):
CAUTION
'
)
cont
d
W
iDe eDge
F
From 19-9/16"
to 19-13/16"
F
From 22-1/16"
to 22-516"
F
From 28-1/16"
to 28-5/16"
u n i t S o n ly
(
)
all unitS
F
HD1376
Screws in bottom
embossed holes
F
HD1377
HD1373
CABINET BACK WALL
5¼"
5¼"
3/4"
CABINET BOTTOM
HH0318A
FIG. 11
FIG. 12
FIG. 13
3½"
FIG. 14

Publicité

loading

Ce manuel est également adapté pour:

Powerpack inserts bbn2243ssPowerpack inserts bbn2303ss