Télécharger Imprimer la page

Zehnder Option Box V2 Manuel De L'installateur page 19

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 47
Foreword
Read this document and the documentation of
the ventilation unit carefully before installing this
device.
With this document you can install and perform
the maintenance of the Option Box V2 / Option
Box V2 Lite for the ComfoAir Q, Comfort Vent Q
and Aeris NEXT in a safe and optimal manner.
In this document the Option Box will be referred
to as "device" and the ComfoAir Q, Comfort
Vent Q and Aeris NEXT will be referred to as
"the ventilation unit". The device is subject to
continuous development and improvement.
Therefore the device may be slightly different
from the given descriptions.
The following pictograms are used in Zehnder's
documents:
Symbol
Meaning
Point of attention.
Risk of poor performance or damage to
the ventilation system.
CHANGED
SAME
Risk of personal injury.
Questions
Contact your Zehnder representative if you have
any questions. Contact details are provided on the
back of this installer manual.
Use of the system
The device is part of a balanced ventilation
system and does not work stand alone. Therefore
the use, safety and warranty instructions of the
ventilation unit also apply for this device. Please
read this document and the documentation of the
ventilation unit carefully before using this device.
1
Safety
■ Always obey the safety regulations,
warnings, comments and instruc-
tions given in this document. When
the safety regulations, warnings,
comments and instructions in this
document are not obeyed personal
injury or damage to the device can
occur;
The device was manufactured by:
Zehnder Group Zwolle B.V.
Lingenstraat 2 • 8028 PM Zwolle • NL
Tel.: +31 (0)38 42 96 911
Company Register of Zwolle
■ Always obey the general and locally
applicable construction, safety and
installation instructions of the local
council, electricity and water boards
or other agencies.
■ After installation, all parts that can
cause personal injury are secured
behind the casing. Tools are required
to open the casing.
■ The installation, commissioning and
maintenance must be carried out by
a certified engineer unless instructed
differently. A non-certified engineer
can cause personal injury or damage
the performance of the ventilation
system;
■ Do not modify the device or the
specifications given in this docu-
ment. A modification can cause
personal injury or damage the perfor-
mance of the ventilation system;
■ Always disconnect all poles of
the power supply of the device,
optional connected ComfoSplitter
and ventilation unit before you start
working on the ventilation system.
The device or ventilation system can
cause personal injury when it is open
while running/switched on. Make
sure the device and ventilation unit
cannot switch back on by accident.
■ Only install a post-heater with a SELV
(Safety Extra Low Voltage) 0-10V
connection and own temperature
safety control. The system is not
designed to be safe when using
a post-heater without a SELV
connection and temperature safety
control.
■ Always take ESD-inhibiting measures
when dealing with electronics, such
as wearing an antistatic wristband.
The electronics can be damaged by
static charges.
EN - 19

Publicité

loading

Ce manuel est également adapté pour:

Option box v2 lite