Télécharger Imprimer la page

Zipper Maschinen ZI-EWB350 Mode D'emploi page 23

Publicité

Les langues disponibles

Les langues disponibles

13
OPERATION
Only operate the machine when it is in a perfect condition. Before each operation, a visual inspection
of the machine must be carried out. Safety devices and operating elements must be checked carefully.
Check in particular the safety equipment, electrical controls, electric cables and screwed connection
for damage and if tightened properly. Replace any damaged parts before operating the machine.
13.1
Operation instructions
Unplug battery before all maintenance and settings!
• Never remove the battery while the machine is running.
• In case of longer standstill, press the shut-down button.
• Use the electric motor only with sufficient battery charge.
13.2
Operation
13.2.1
Start electrical support
ZIPPER MASCHINEN GmbH
www.zipper-maschinen.at
14. Machine assembling completed
WAR N I N G
N O TE
1. Turn ON-Off-Switch (1) to Position „I":
the left battery cartridge (2) ist activated.
2. Turn ON-Off-Switch (1) to Position „II":
the right battery cartridge (3) ist activated.
NOTE:
Only one batteray cartridge can be activated
3. Select the direction of motor rotation and thus
the forward or backward movement of the
machine by pressing button (2). The selected
direction is indicated by the arrows L4/L5.
4. By pushing the button (3) the BAS activated /
EBS deactivated.
L3 lights red: EBS activated
L3 lights green: EBS deactivated
BAS = Brake assistance if no electronic support is
requested
EBS = Electronic Brake: Machine is braked and
braking effect is maintained as long as
- until battery empty
- until EBS is deactivated again
5. By pushing the lever (1), the strength of the
electrical support is adjusted; the further the
lever is turned away from its initial position, the
stronger the support.
NOTE:
no activation on electrical support means
BAS active (braking effect noticeable)
6.
NOTE:
If EBS is activated, no electric drive
assistance in forward or reverse direction.
OPERATION
23
ZI-EWB350

Publicité

loading