Below, alternate configuration #1, #2 and #3 shows the flow switch must be in front of the cell.
Never use configuration #4. The #2 is the best configuration.
Flow Switch:
IMPORTANT: There must be at least a 30 cm straight pipe run before (upstream) the flow switch. The
flow switch must be plumbed before the cell. To ensure proper operation, verify that the arrow on the
flow switch (located on top of gray hex) points in the direction of water flow. Refer to the diagram below.
Electrolytic Cell: Install using the unions provided. Tighten unions BY HAND for a watertight seal. For pool/spa
combination systems with spillover, use configurations #2 or #3 above to allow chlorination of both the
pool and spa during spillover but preventing overchlorination when operating the spa only.
Wiring
Power must be shut off at the circuit breaker before performing any wiring. Be sure to follow Local electrical codes. To
provide safe operation, the AquaRite Pro LS must be properly grounded. All metal equipments of the pool must be at the
same electrical potential (ground).
Input Power:
Wire the AquaRite Pro LS to the 230 V from the subpanel.
⚠
This circuit must be protected by a differential protection device that protects against no more than 30ma
leakage current.
Page 13 of 16
FLOW
ELECTROLYTIC
SWITCH
CELL
30 cm
minimum
POOL
30 cm
minimum
VALVE
FLOW
SWITCH
ELECTROLYTIC
CELL
POOL
Drill a 17mm hole
into the return pipe
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
AquaRite
1
30 cm
ELECTROLYTIC
minimum
FLOW
SWITCH
VALVE
VALVE
SPA
3
ELECTROLYTIC
VALVE
FLOW
VALVE
SWITCH
SPA
Pro LS
®
2
CELL
VALVE
VALVE
4
CELL
VALVE
Line up arrow with
direction of flow
Position the saddle clamp's
rubber seal over hole.
Tighten clamp evenly.
Rev. D