(2) Insert the drain body up
through the drain hole from
below the lavatory. If necessary,
turn the nut and push the washer
and gasket (thick) down to allow
for clearance.
While holding the drain body in
place, fasten the flange to the
drain body from the top. Ensure
that the gasket is between the
flange and the lavatory as shown.
Once the flange is fully seated,
turn the nut below the lavatory
up until a good seal is formed.
Do not overtighten!
(ill. 5)
Reinsert the plunger if needed.
(3) Mount the drain lift rod in the proper direction. (ill. 6)
ill. 6
Spout
Short
4-7/16"
(113)
Long
5-11/16"
(145)
INSTALLATION PROCEDURE
Part number of the lavatory
LT475
LT476
ill. 5
Plunger
Drain
assembly
Long 5-11/16"
(145)
Short 4-7/16"
(113)
6
Attention
to direction
Lavatory
of plunger
Flange
Deformed
gasket
Flanged nut
Lever hole
Unit: inch
(mm)
Spout
Other than the
part numbers
written on the left