Télécharger Imprimer la page

Polygroup SUMMER WAVES ELITE Manuel De L'utilisateur page 10

Masquer les pouces Voir aussi pour SUMMER WAVES ELITE:

Publicité

Les langues disponibles

Les langues disponibles

11. Continue to slide the sets of Horizontal Beams and
T-Fittings through the remaining sleeves and link them
together to create the top frame structure.
12. Connect the set of Horizontal Beam and Easy Link T-Fitting
until you completed the full circle (see Figure 7).
Figure 7
14. Look through the hole at the bottom of the T-fitting, as you insert the Vertical
Leg 3 with Leg Cap 6, rotate it until the buttons align with the holes and pop out,
locking the Vertical Leg in place (see Figure 9). Do this for all Vertical Legs.
Note: Each Vertical leg has a V-Shaped Spring Pin 7 pre-installed.
There is an extra pin included with your pool parts.
Tip: To avoid distortion during the assembly of the pool frame, connect one
Vertical Leg to every three T-Fitting so the frame can stand comfortably.
Connect the rest of the Vertical Legs to to finish assembling the pool.
15. Go around and check all fittings, Push-buttons of O-Pins ,
Legs, and Beams are properly installed and secured in place.
Make sure the drain fitting is plugged securely and the
cap is in place (see Figure 10).
Figure 10
CAUTION:
• Not following the steps above will make the pool fill unevenly and it may lean to
one side and collapse (see figure 11). Your pool should be straight and vertical to the ground.
If your pool is leaning at all, the ground may not be level and you will need to start over.
• Do not press the T-Fitting push button when filling the water in the pool or using the pool.
Only press the T-Fitting push button when the pool is empty.
WARNING!
FAILURE TO FOLLOW THE INSTRUCTIONS ABOVE WILL CAUSE POOL TO COLLAPSE
WILL VOID THE WARRANTY.
10
13. Carefully slide the connected Vertical Legs 3 with Leg Caps 6
up through the belts that runs around the middle of the pool (see Figure 8a).
Tip: For smaller pools without a belt, slide the vertical legs up
through the sleeves on the pool wall (see Figure 8b).
Figure 8a
3
16. Fill up the pool with about an inch (1") [2.54 cm] of water. Stop filling
and smooth out all the wrinkles from the pool floor, working outwards
from the center, so that it fills evenly. Gently tug the Vertical Legs
outwards to ensure all legs are vertical and perpendicular to
the ground.
Note: If more than 1 to 2 inches (1"-2") [2.54 cm-5.08 cm] of
water collects on any one side before the pool starts filling in the
center, the pool is not level enough, and must be corrected.
17. Install the filtration system as per its instruction manual.
18. Continue to fill the pool to approximately 8 inches (8") [20.32 cm]
below the top rim.
3
Figure 8b
Figure 9
Figure 11

Publicité

loading