Télécharger Imprimer la page

Ingersoll Rand 2400P-EU Manuel D'instructions page 3

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 5
9. Submerge the fill opening in the remainder of the fluid,
and using a wrench, rotate the Drive Shaft to purge any
remaining air from the system.
10. Remove the mechanism from from the fluid and use
the Tee Wrench to push the Piston Stop Assembly
slowly downward until fluid flows from the fill
opening.
LUBRICATION
Ingersoll–Rand No. 50
Always use an air line lubricator with these tools.
We recommend the following Filter–Lubricator–Regulator
Unit:
International – No. C18–C3–FKG0
After each 20 000 cycles, or as experience indicates, drain
and refill the Impulse Unit Drive Assembly as instructed in
this manual using the Fluid Replacement Kit (Part
No. EQ106S–K400). Lubricate the hex drive and the output
shaft before assembly.
Model
Type of
Handle
2400P–EU
pistol
3000P–EU
pistol
G Tested in accordance with ANSI S5.1–1971 at free speed
♦ Tested to ISO8662–1 loaded with frictionbrake to 9 RPM
All manuals and user guides at all-guides.com
ADJUSTMENTS
(Dwg. TPD1265)
PLACING TOOL IN SERVICE
Ingersoll–Rand No. 67
Ingersoll–Rand Fluid Part
No. EQ106S–400–1
SPECIFICATIONS
Drive
Free
Recommended Torque
Speed
in.
Soft Draw
ft–lb (Nm)
1/2
4,300
35–80
(47–108)
3/4
4,500
60–110
(82–150)
11. Thread the Oil Plug with the Oil Plug Seal and Seal
Support into the mechanism until it is snug.
12. Using a 2 mm hex wrench, turn the Torque Adjustment
Screw clockwise until it stops. This is the maximum
torque position.
13. Wipe the outside of the mechanism dry and clean and
remove the Oil Chamber Plug. Using the syringe,
withdraw 0.5 cc of fluid from 2400P–EU models and
1.0 cc from 3000P–EU models.
14. Install the Oil Chamber Plug and tighten it between 20
and 25 in–lb (2.3 and 2.8 Nm) torque.
15. Position a new Hammer Case Gasket on the Motor
Housing and install the assembled mechanism on the
rotor shaft.
16. Place the Hammer Case Cover over the Drive Shaft
against the Housing and Gasket. Install the four
Hammer Case Cap Screws and Lock Washers. Tighten
each Screw between 45 and 50 in–lb (5.1 and 5.6 Nm)
torque.
17. Install the Rubber Housing Boot on the tool.
MAIN LINES 3 TIMES
AIR TOOL INLET SIZE
TO
AIR
SYSTEM
TO
AIR
TOOL
LUBRICATOR
REGULATOR
BRANCH LINE 2 TIMES
AIR TOOL INLET SIZE
DRAIN REGULARLY
GSound Level
Range
Hard Slam
Pressure
ft–lb (Nm)
107–170
– – –
(145–230)
124–210
81.5
(169–286)
3
FILTER
COMPRESSOR
(Dwg. TPD905–1)
♦Vibrations
dB (A)
Level
Power
m/s
– – –
– – –
– – –
3.0
2

Publicité

loading

Ce manuel est également adapté pour:

3000p-eu