Télécharger Imprimer la page

Cassese CS1 CART Manuel D'utilisation Et De Pièces page 17

Publicité

Les langues disponibles

Les langues disponibles

H) REPLACEMENT OF THE WEDGE DISTRIBUTION
First, you must withdraw the side panel as explained previously. To replace more easily
the wedge distribution channel elastic cord, you have to follow these differents steps
which will be detailed :
1.
Unscrew the nut (with the socket
spanner 7mm) which maintain the
elastic cord and the connection wire.
3.
Remove the elastic cord of the
screw.
5.
Unscrew the last screw with
the Allen key of 4mm.
Non contractual document - Cassese France
All manuals and user guides at all-guides.com
CHANNEL ELASTIC CORD
First, you must take 2 tools :
-Socket spanner 7mm
-Allen key 4mm
14
2.
Push away the connection wire in
order to free the working space.
4.
Now, the elastic cord is just
grasped by the last screw.
6.
In order to refit the system, do
the following steps in the reverse
direction.
- Document non contractuel
®

Publicité

loading