Preparation and transport guide
Introduction
Warning
Unpacking
4
All manuals and user guides at all-guides.com
This section is a guide to unpacking, preparation, transport and storage
If the machine has been transported lying down, allow it to stand upright for at least 1
hour before use.
Follow these steps for unpacking:
Step
Action
1
Pull the box free of the de-
humidifier
2
Lift the dehumidifier of the
pallet. It is now ready to be
positioned as shown below
3
Connect the hose spigot
provided
4
Remove the protective foil on the control panel
www.dantherm-ltd.ru • info@dantherm-ltd.ru • +7 (495) 545-48-79
Москва. Каширский проезд д. 19 стр. 2
Illustration
Continued on next page