Télécharger Imprimer la page

RS Pro RS-9985 Mode D'emploi page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Insulation Tester with Multimeter / English
If you want to clear all the memory data, complete the following:
When power is on, hold down the EXIT button and then turn the switch from OFF to
random. After releasing the EXIT button, the LCD will flash twice and meantime buzzer
twice, which means all memory data have been cleared.
2 RECALL function
Press STORE button for two seconds to enter into RECALL function. The left upper corner
shows XXXX. This shows the current storage serial number. The right upper corner shows
XXXX. This shows how much current storage is used.
Use button + & — to select serial number XXXX on the left upper corner and record data
on the right upper corner.
To end RECALL function, press EXIT button.
Parameter setting up (SET)
1. Press the RANGE button for 2 second to enter into SET function. Then press the
button again to enter setting content. Setting content includes (in sequence):
A: upper limit buzzer alarm
B: lower limit buzzer alarm
C: auto power off time
D: turn off phonating
E: back lit time
Use
,+,-,
buttons to select the parameter
2 Press SET button continuously to switch to setting content, till exiting set up to testing
mode. The updated setting content is saved. Pressing the EXIT button in this period, all
setting can't be saved.
AC+DC
In all the measuring mode VAC,mV(AC),10A(AC),mA(AC),uA(AC), pressing the EXIT button
for 2 seconds will open AC+DC testing.
The precision is the same as AC measure. LCD shows AC+DC signal. Press EXIT button to
exit.
LOW BATTERY INDICATION
When the icon appears alone in the display, the battery should be replaced.
18
All manuals and user guides at all-guides.com
Maintenance
This multimeter is designed to provide years of dependable service, if the following care
instructions are performed:
1. KEEP THE METER DRY. If it gets wet, wipe it off.
2. USE AND STORE THE METER IN NORMAL TEMPERATURES.
3. HANDLE THE METER GENTLY AND CAREFULLY. Dropping it can damage the
4. KEEP THE METER CLEAN. Wipe the case occasionally with a damp cloth. DO NOT
5. USE ONLY FRESH BATTERIES OF THE RECOMMENDED SIZE AND TYPE. Remove
6. IF THE METER IS TO BE STORED FOR A LONG PERIOD OF TIME, the batteries
BATTERY INSTALLATION
1. Turn power off and disconnect the test leads from the meter.
2. Open the rear battery cover by removing two screws (B) using a Phillips head screwdriver.
3. Insert the battery into battery holder, observing the correct polarity.
4. Put the battery cover back in place. Secure with the screws.
NOTE: If your meter does not work properly, check the fuses and batteries to make sure
that they are still good and that they are properly inserted.
25/01/2018 Version No. 001
25/01/2018 Version No. 001
Insulation Tester with Multimeter / English
WARNING: To avoid electric shock, disconnect the test leads from any source of
voltage before removing the back cover or the battery or fuse covers.
WARNING: To avoid electric shock, do not operate your meter until the battery and
fuse covers are in place and fastened securely.
Temperature extremes can shorten the life of the electronic parts and distort or melt
plastic parts.
electronic parts or the case.
use chemicals, cleaning solvents or detergents.
old or weak batteries so they do not leak and damage the unit.
should be removed to prevent damage to the unit.
WARNING: To avoid electric shock, disconnect the test leads from any source of
voltage before removing the battery cover.
WARNING: To avoid electric shock, do not operate the meter until the battery cover
is in place and fastened securely.
19

Publicité

loading