Commissioning
DE
8
Commissioning
US
FR
IT
ES
RU
NL
DK
SE
FI
PT
GR
PL
Before commissioning, ensure the following:
CZ
• Check the mounting and installation.
SK
• The device must not be damaged.
HU
• Remove any foreign objects.
• If necessary, clean the connection chamber.
SL
• Monitor whether the electrical lines have been inserted correctly.
RO
• Monitor whether all screws and nuts have been tightened securely.
BG
• Monitor whether all cable entries and stopping plugs have been tightened securely.
• Monitor whether all conductors have been clamped firmly.
LV
• Observe the line voltage.
LT
• Seal the unused cable entries with plugs certified according to
EE
Directive 2014/34/EU or ANSI/UL and unused drilled holes with stopping plugs
certified according to Directive 2014/34/EU or ANSI/UL.
CH
KR
9
Operation
CN
Only type 8571/22 plugs from R. STAHL may be used.
22
SolConeX
Receptacle, 30 A
8571/21 series
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Damage or destruction of the device by arc and high pressure is
possible if improper switching operations are used!
Non-compliance can result in severe or fatal injuries.
• Quickly switch the device on and off completely.
• Avoid switching positions between 0 and I (ON and OFF).
The receptacle may only be operated when fully mounted.
The receptacle can be switched only with the plug inserted.
If the plug has been disconnected, lock the hinged cover with the
bayonet ring.
DANGER
WARNING
294386 / 8571661300
2022-08-08·IO00·III·en·00